Working process of CGD City gas distribution

CGD work Area :- 

1. Feasibility Study 
2. Network planning and designing
3. Project management 
4. CGD operations and management
5. Safety and operation of CNG and PNG
6. CGD pipeline Network 
7. Study of PE distribution Network 
8. CGD and CNG installations 
Regulations of pipeline and CGD & complience
9. Field level Technician, plumber, fitter, compressor operator. 
10. CGD businesses competition and                     Technology

LNG Re-Gas Infrastructure :-

Existing capacity of regasification infa in India is almost - 39.5 MMTPA including in ore and mundra terminal.

Only Dahej terminal of petro LNG and Hazira Terminal of shell is operating in high capacity utilisation. 


LNG Value chain :-


Gas field and  -         LNG           -     Cryogenic  - 
 Extraction           production            Vessels



Regasification    -     Transport 
   Plant 




CGD Network :- 

Selection of cgd design network is based on gas properties, required flow rate, operating pressure and environment. 

It mainly consist of - 

1. CGS ( City gas station) 
2. Pipeline Network such as Steel Pipe, PE ( poly      ethylene), GI ( gulvanised iron) and copper             tube
3. Regulating Station such as DRS, SR, IRS, etc
4. Metering Station like Turbine meter, orifice            meter, RPD meter 

5. CNG Station MRS, DRS 



Comments

Popular posts from this blog

Three phase induction motor is made up of which metal

What is IP ratings in Electrical Motor